Obviously, I don't have 60 days working on the boat. I am mostly there on the week-ends. This one was a 3-days stretch, then more work can be done.
I am still missing parts for the clutch, then the boat is still immobilized. Anyway, I am tackling the things in order of importance - roughly.
I want to add a backing plate on those cleats. First, I need to pull them out. Big job, accessibility is bad. One to go. |
Wanted to check this sail. Looks like a Jib, 5m x 9m x 10.5m |
Removed the old autopilot. Did not work and installation was poorly done, at best. |
Tested the emergency tiller. As my wheel steering is still down, it might be useful :) |
Halyard replacement. First try. This one was too big. |
This one was too small. It broke. |
Alright, it is up there now. |
Kriss, I will have to climb the mast tomorrow.
I never look forward to this.