Sunday, November 20, 2016

Boat Projects (Contd)


Profiting that the boat is back at the harbor, I am drilling on the current boat projects.


Transmission oil really needed to get back to a nice red color 


Air filter - after cleaning. Let the diesel breathe.

Quite some work to get the ice back on the fridge plates. Refrigeration specialists are nowhere to be find nowadays,
I have to improvise myself to act like one.

Still cranking on cleaning fuel. Less contamination.
It might be working.

Much needed oil - filter change.

Preparing for the electronics installation.
Finding my way in the electrical panel mess was not a small adventure.

The plexiglass panel(s) are now locked in place.
It makes the dodger rigid and sturdy. 

Bimini - 4 panels - Draft version - is in place. That was lots of work, but already worth it.
Protection from the West side sun is priceless.

Finally got rid of those fake SS clamps in the bilge.
they did not last 6 months. Good lesson, sometime, marine quality stuff is needed :)

The boat is still at the dock for two more weeks, and changing the fuel filter system and installing the remaining of the new electronics is on the program.
More to come.



No comments :

Post a Comment